majesticglobalexteriors.

Cafe Renovation and Fit-Out Experts — Turnkey Design-Build with Fixed Pricing and 30-Day Turnaround

We specialize in fast, coordinated cafe transformations that blend brand-forward design, precise engineering, and disciplined construction, delivering fixed-price, permit-ready build-outs in just 30 days while protecting your budget, minimizing downtime, and creating memorable guest experiences that drive repeat visits and higher ticket averages.

Learn More
Full-length shot of a woman holding a smartphone.

About Our Cafe Design-Build Team

We are a specialized design-build studio focused exclusively on cafes and light hospitality, combining brand strategy, technical design, and construction expertise to deliver fixed-price, 30-day build-outs that perform beautifully, operate efficiently, and welcome guests with memorable, revenue-driving experiences.

Overhead view of a worker laying floor tiles
A man working in a warehouse for MDF boards.

Our 30-Day Method

A single integrated team runs design, procurement, and construction in parallel with preapproved scopes and suppliers, compressing timelines without sacrificing quality, while daily progress controls keep milestones accountable and your opening date protected from avoidable delays.

Learn More

Fixed-Price Promise

Our fixed prices are built from validated scopes, standardized details, and vendor lock-ins, protecting your budget from creep while maintaining flexibility for minor field adjustments through predefined allowances and transparent change thresholds communicated before any commitment is signed.

A waitress is cleaning a table.

Permitting and Compliance

We prepare permit-ready packages with stamped drawings, health department summaries, and mechanical schedules tailored to your jurisdiction, coordinating reviews with inspectors to minimize comments and keep your 30-day plan aligned with required approvals and inspections.

Materials and Finishes

We specify commercial-grade finishes that balance durability, cleanability, acoustics, and brand aesthetics, validating availability and lead times before approval, so what you see on the mood board is what arrives on site on time and within budget.

High-Traffic Flooring Systems

From slip-resistant porcelain to poured urethane with integral coves, we select flooring that resists staining and frequent cleaning, coordinating transitions at thresholds and behind-bar areas to prevent moisture migration while matching your visual narrative and maintenance capabilities.

Overhead view of wood tools on a desk
Architectural project featuring a composition of different tools with copy space

Beverage Bar Ergonomics

Station sequences are organized for speed and consistency, optimizing pitcher rinse, grinder placement, milk storage, and handoff points, reducing barista steps while maintaining safety, cleanliness, and a thoughtful customer-facing theater that reinforces your brand standards during rushes.

Close-up of people making a home comfortable.

Electrical and Panel Planning

We map dedicated circuits for espresso, grinders, undercounter refrigeration, POS, and lighting, verify panel capacity, and provide labeled schedules and load calcs, ensuring balanced distribution with room for future upgrades and eliminating nuisance trips during simultaneous equipment operation.

Craftsman making a wood piece

Plumbing and Drainage Clarity

Grease interceptor requirements, floor sinks, and condensate routing are detailed early, with cleanouts and slopes coordinated to prevent backups, allowing health inspectors to see a clear, code-compliant system that supports fast approvals and long-term operational reliability.

Brand Experience and Customer Flow

We choreograph the journey from entry to order to pickup and seating, aligning sightlines, menu placement, and queue management with service style, ensuring guests move naturally and happily while staff maintain pace and hospitality feels effortless.

Queue and Menu Visibility

Entrance sightlines frame the menu and pastry displays, while lighting contrasts guide eyes to ordering points, reducing decision friction and keeping the line compact yet comfortable, which improves throughput and encourages impulse add-ons like bakery or seasonal beverages.

Pickup and Dwell Strategy

We separate order pickup from the main queue to prevent congestion, provide intuitive signage, and offer quick-dwell counters for short stays, ensuring guests receive orders quickly without blocking service lines or diminishing the overall ambiance of your space.

Seating Mix Optimization

A balanced mix of bar seating, two-tops, and communal tables supports various dwell times, while power access, acoustic buffers, and daylight management improve comfort, increasing repeat visits and average spend without compromising turnover during peak morning and lunch periods.

Sustainability and Efficiency

We prioritize energy-efficient equipment, water-saving fixtures, and low-VOC materials while designing for maintenance access and longevity, cutting operating costs and environmental impact without sacrificing performance, aesthetics, or the pace of your build schedule.

Energy-Smart Equipment Choices

We propose ENERGY STAR refrigeration, induction warming where appropriate, and programmable lighting controls, paired with zoning strategies that reduce peak demand, helping you lower utility bills and enhance reliability without impacting the customer experience or product quality.

Water and Waste Reduction

Low-flow faucets, metered rinse stations, and thoughtful waste sorting stations reduce water use and improve recycling compliance, while back-of-house layouts simplify staff routines, turning sustainability goals into daily habits that are practical and measurable over time.

Healthy Interior Materials

We select low-VOC paints, durable laminates, and certified wood products, minimizing off-gassing and maintenance needs, so air quality remains high from opening day, and finishes maintain their appearance even with frequent cleaning cycles common in busy cafes.

A male carpenter working on a roof.

Construction Management and Safety

We run a clean, tightly scheduled site with daily safety briefings, noise controls, and protection for adjacent tenants, meeting building rules while keeping neighbors comfortable and the work predictable for every trade on the project.

Daily Production Tracking

Foremen report progress against the hour-by-hour schedule, and blockers receive immediate action items, allowing us to re-sequence work as needed and keep the finish line intact, even when unexpected constraints surface during demolition or rough-in activities.

Quality Control Checkpoints

Pre-cover inspections review framing, waterproofing, and rough MEP, while pre-finish checks validate substrate flatness and tolerances, ensuring visible surfaces install smoothly and punch items remain minimal, protecting your schedule and long-term operational durability.

Tenant and Landlord Coordination

We align deliveries, work hours, and service elevator access with building management, post clear signage, and maintain protection at corridors and lobbies, minimizing disruption and demonstrating professionalism that supports your reputation with landlords and neighboring businesses.

A craftsman making a wooden piece.
A man working in an MDF board warehouse.
Vertical shot of a young man walking with luggage, carrying a suitcase as he goes on vacation.

Handover and Post-Launch Support

We do not disappear at opening; we train your staff on systems, provide maintenance schedules, and return for a day-30 tune-up, ensuring your new space performs as designed and small issues are resolved quickly before they become headaches.

  • Your team receives equipment manuals, cleaning protocols, and shutoff maps, plus hands-on walkthroughs for espresso, refrigeration, and HVAC basics, so managers can solve common issues fast and escalate only when specialized service is truly required.

  • We register warranties, provide service contact sheets, and set up preventative maintenance calendars, making it simple to schedule filter changes, calibrations, and inspections that protect your investment and keep daily operations smooth and predictable.

  • After one month of real operations, we revisit flow, comfort, and equipment performance, applying minor adjustments like lighting levels, door closers, or queue barriers to enhance guest experience and staff efficiency without interrupting business hours.

Financing and ROI Planning

We help align your budget with performance goals through phased scopes, financing introductions, and revenue modeling, so your investment supports cash flow and delivers measurable returns rooted in throughput, dwell time, and average ticket growth.

Contact us

Payback and Throughput Modeling

We estimate payback using service time improvements, seat utilization, and energy savings, aligning design choices with revenue and cost metrics so you can see how each decision influences returns over the first months of operation and beyond.

Phased Investment Options

When needed, we structure scope into two stages, delivering a fast open and then layered upgrades after revenue stabilizes, letting you launch earlier while still achieving your full brand vision within a controlled, predictable financial plan.

Lender and Landlord Packages

We prepare clear drawings, fixed-price contracts, and schedules to support lender approvals and landlord consent, helping secure funds and permissions quickly while demonstrating that your project is realistic, compliant, and responsibly managed from start to finish.

Turnkey Services

Select a service tier that matches your goals and timeline, from concept and permits to complete 30-day build-outs, each delivered by a unified team that locks pricing, coordinates vendors, and guarantees disciplined schedules to protect your opening date.

Turnkey 30-Day Cafe Fit-Out Package

A complete design-build delivery including concept refinement, permit-ready drawings, procurement, construction, equipment set, commissioning, staff training, and day-30 tune-up, ideal for new cafes or major rebrands seeking reliable schedules and fixed pricing without sacrificing craftsmanship or guest-centered design excellence.

,000

Permit-Ready Design and Engineering Set

Comprehensive architectural, MEP, and health department documentation with coordinated equipment schedules, finish sheets, and code narratives, optimized for fast approval and competitive bidding, perfect for clients who already have a contractor but need clear, buildable drawings and reduced review cycles.

,000

Overnight Refresh and Rebranding Sprint

A rapid makeover focused on lighting, paint, signage, select millwork, and minor equipment repositioning to boost throughput and guest perception, delivered with minimal downtime and careful protection of existing infrastructure, designed to create immediate impact at a controlled investment level.

,000

Overhead view of a worker tiling a floor.

Multi-Site Rollouts

We scale design standards, fixture kits, and vendor lanes across multiple locations, enabling consistent quality, predictable budgets, and repeatable schedules that keep your brand recognizable while flexing to different footprints and regional code requirements.

Standards and Kit-of-Parts

We build a kit-of-parts including finishes, millwork modules, and lighting families, plus documented alternates, allowing quick local substitutions without losing brand coherence while keeping procurement efficient and adaptable to regional supply conditions.

Prototype to Adaptation

A strong prototype drives consistency, but we adapt seating, queue paths, and equipment counts to match specific sales patterns and footprints, ensuring each site keeps performance goals while maintaining recognizable brand elements that guests trust and expect.

Centralized Procurement

We coordinate bulk purchasing for lighting, hardware, and equipment with logistics staging and serialized deliveries, lowering costs and reducing variance while keeping on-site teams focused on installation quality and punch-free handovers across the portfolio.

Digital Tools and Visibility

You track progress in real time through our client dashboard with schedules, photos, permits, and cost logs, ensuring decisions are quick, transparent, and aligned with your opening date and marketing plans for a confident launch.

Client Dashboard Access

A secure portal highlights milestones, approvals, RFIs, and daily site photos, giving you actionable visibility without micromanagement, so you can make timely decisions and keep stakeholders informed with accurate, current information at every stage.

Change Governance

When a change is needed, you see cost and schedule impacts instantly with clear options and approval buttons, minimizing confusion and protecting momentum while documenting decisions that keep the project compliant and auditable for future reference.

Closeout Records

At handover, you receive organized as-builts, warranties, maintenance plans, and inspection records digitally, making facility management simple and establishing a reliable foundation for future upgrades or additional locations with shared knowledge preserved.

Frequently Asked Questions

How can you deliver a complete cafe fit-out in 30 days?
Our timeline works because design, procurement, and construction run in parallel through standardized details, vendor lock-ins, and daily site coordination. We freeze decisions early, pre-book critical materials, and manage inspections proactively, so installers move continuously without rework, keeping your opening date intact.
What does fixed pricing include and exclude?
Fixed pricing covers defined design scope, permit-ready documents, materials, equipment per schedule, labor, and commissioning, with listed exclusions for items like landlord-required base building changes. Allowances address typical unknowns, and only client-driven scope changes or unforeseen authority mandates can adjust the contract value.
How do you handle permits and health department approvals?
We prepare jurisdiction-specific, stamped documents and clear health narratives, then coordinate directly with reviewers to minimize comments. Early equipment schedules, plumbing diagrams, and finish matrices reduce ambiguity, while our response windows keep reviews moving, so approvals align with the 30-day construction plan.
Will construction disrupt neighboring tenants or operations?
We sequence deliveries, maintain clean corridors, implement noise controls, and coordinate work hours with building management. Protection, signage, and communication protocols keep common areas safe and presentable, while our disciplined schedule limits duration on site, reducing impact on neighbors and maintaining your landlord relationship.
Can you work within a small footprint or irregular space?
Yes, we optimize equipment counts, bar ergonomics, and seating mixes to suit compact or unusual layouts, using modular millwork and tailored MEP routing. Our constructability-first detailing ensures clean installations even in tight conditions, preserving performance, aesthetics, and access for future maintenance.
How do you ensure long-term durability and easy maintenance?
We specify commercial-grade finishes, energy-smart equipment, and accessible service pathways, then provide maintenance plans, shutoff maps, and warranties at handover. Day-30 refinement confirms real-world performance, and our vendor network supports swift repairs, keeping your cafe efficient, attractive, and cost-effective over time.

Contact us

Technical support

info@majesticglobalexteriors.com

Working hours

Monday—Friday: 08:00–17:00

Saturday—Sunday: 08:00–12:00

Address

6361 Fallsview Blvd, Niagara Falls, ON L2G 3V9, Canada